GERMANY · BUSINESS AVIATION

Strausberg Airport

Berlin regional airport · ICAO EDAY

ICAO EDAY
BERLIN, NOW
Strausberg Airport —
Aerial view of Strausberg airfield, 2023. Photo: Carsten Steger, CC BY-SA 4.0; resized and converted to WebP.
ICAOEDAYBerlin
MAIN RUNWAY1,200 × 28 mConcrete runway 05/23
AIRCRAFTUp to 14 tonnesIndividual performance assessment
FLIGHT RULESVFR and IFRNight flights by prior arrangement

GERMANY · BUSINESS AVIATION

Strausberg Airport

Strausberg Airport is a general and business aviation airport east of Berlin. Its 1,200-metre concrete runway and instrument approaches make it a possible arrival point for a suitable light aircraft or business jet. EDAY is particularly worth comparing for Strausberg and eastern Brandenburg. For central Berlin, the aircraft, flight window and complete road journey need to be assessed together.

BUSINESS AVIATION

Arriving at Strausberg Airport

This is a small airport serving several forms of aviation, including business flights and training. Your instructions should identify the receiving team and passenger meeting point. Do not send the driver to Berlin Brandenburg Airport: BER and EDAY are different airports on different sides of the metropolitan area.

Agree assistance with bags, steps and any mobility requirement before confirming the aircraft. The short distance between a reception and the apron does not remove access controls. Passengers should follow the receiving team’s instructions rather than walking independently towards the aircraft.

OPENING HOURS

Arrange a late arrival before the trip

The airport publishes seasonal hours. Operations outside them are subject to prior permission, with advance request deadlines. Night capability therefore does not mean an unannounced arrival is accepted at any hour. The confirmation should state the flight’s local time and the accepted operating arrangement.

For a same-day business visit, tell the team how late the meeting might finish. Ask whether the return window includes that flexibility and what happens if it does not. A later aircraft departure can also require a new crew and ground-service plan.

RUNWAY AND PAYLOAD

Match the aircraft to the 1,200-metre runway

The published concrete runway measures 1,200 by 28 metres, with aircraft permitted up to 14 tonnes. The limit is not a list of guaranteed aircraft types. The operator must assess the actual aircraft, weather, runway condition and intended load.

For a group carrying skis, bulky exhibition material or several large cases, provide dimensions as well as the number of bags. A useful comparison explains both cabin comfort and how much baggage and fuel the aircraft can take. A fuel stop can change the overall benefit of a closer airport.

INSTRUMENT APPROACHES

IFR helps planning but does not remove weather limits

The airport offers instrument approaches in both runway directions. A suitable aircraft and qualified crew can therefore plan an instrument arrival, subject to the current procedures and conditions. This is different from an airfield limited to visual arrivals.

It still cannot guarantee a landing in every weather situation. Ask which alternative airport is planned and how a diversion changes the car journey. If the appointment is critical, include a workable buffer between the expected arrival and the meeting.

BERLIN AND BRANDENBURG

Compare the destination, not only the city label

Strausberg is east of Berlin and can suit a visit to the town or eastern Brandenburg. For an address elsewhere in the capital, compare the entire transfer with Berlin Brandenburg Airport. Use the actual office or hotel address rather than a generic city-centre estimate.

For an airline connection, allow for the inter-airport drive, check-in and security. A private arrival at EDAY is not an airside connection at BER. For several meetings, give the order of stops so the outbound and return airport choice reflects the whole day.

FLIGHT PROPOSAL

Agree the ground plan and international formalities

For a cross-border flight, confirm the applicable immigration and customs arrangements with the operating team before booking. Do not assume that a small European airport has permanently staffed border facilities. The flight’s origin and passenger documents determine what is needed.

Send Lustrina Jet the route, dates, local times, passengers, luggage and final addresses. Include overnight parking or hangar requests and any uncertainty about the return. The proposal should identify aircraft suitability, airport acceptance, handling and onward transport as one practical itinerary.

FAQ

Practical questions

Can business jets use Strausberg?⌄

Suitable aircraft can use EDAY after operational assessment and acceptance.

What is the main runway length?⌄

The concrete runway is 1,200 metres long and 28 metres wide.

Are instrument approaches available?⌄

Yes, the airport publishes instrument approaches for both runway directions.

Can I arrive at night?⌄

Night operation is possible by prior arrangement and within the accepted conditions.

Is EDAY the same airport as BER?⌄

No. Strausberg and Berlin Brandenburg are separate airports.

What should the charter request include?⌄

Route, dates, local times, passengers, luggage, addresses and return flexibility.

BERLIN

Airport and city

N ↑EDAYBerlin

Location diagram, not a driving route. Use the terminal entrance confirmed for your private flight.

Google Maps ↗

LUSTRINA JET

Arrange your private flight

Send your dates, passenger count, baggage and destination address to plan your private flight.

Request a quote ↗
Sources and photograph

Airport: facilities and prior permission · Airport: location and noise-sensitive surroundings

Necessary technologies are always active. Analytics is optional and starts only with your consent. You can change your choice here at any time.