ABU DHABI · UNITED ARAB EMIRATES

Al Bateen Executive Airport

Abu Dhabi’s dedicated business aviation airport, close to the city centre.

IATAAZIICAOOMAD
LOCAL TIME IN ABU DHABIAsia/Dubai
Abu Dhabi skyline and waterfront
Al Bateen is an executive aviation airport within Abu Dhabi, separate from Zayed International Airport.
RUNWAY 13/313,202 m45 m wide; declared distances differ by direction
BUSINESS AVIATIONDedicated airportExecutive terminal and VVIP facilities
CITY ACCESSCentral Abu DhabiADNEC around 5 minutes by road; traffic varies

Al Bateen Executive Airport, Abu Dhabi · Map © OpenStreetMap contributors

Map data © OpenStreetMap contributors
YOUR VISIT, AT A GLANCE

Al Bateen: Abu Dhabi’s business aviation airport

Al Bateen Executive Airport (AZI / OMAD) is the dedicated business aviation airport within Abu Dhabi. It is a practical arrival choice for government, corporate and private flights whose destination is in the capital, with the main city districts and ADNEC close by.

Al Bateen is distinct from Zayed International Airport (AUH), which handles the city’s main airline traffic. The airport operator describes a VVIP terminal, executive lounges, hangars and apron parking. It is a purpose-built executive facility rather than an airline-terminal FBO attached to AUH.

Abu Dhabi Airports states the airfield has a 3,202 m runway, 45 m wide, and capacity for more than 50 private jets on stand. The current UAE AIP and airport operating notices govern declared distances and aircraft acceptance. Check those details for the exact aircraft, timing and handling request.

IS IT RIGHT FOR YOUR TRIP?

Where Al Bateen can work well

Abu Dhabi city and ADNEC

The airport is located within the capital. Abu Dhabi Airports gives a five-minute road estimate to the Abu Dhabi National Exhibition Centre; events and traffic can change the actual trip.

Executive and official travel

A dedicated VVIP facility, private terminal and executive handling support trips where a separate business aviation experience is useful.

Technical stops

The long runway and UAE location can suit some fuel or technical-stop plans. Fuel availability, parking, handling and onward permissions depend on the individual movement.

When Zayed International may be preferable

AUH may better fit passengers connecting to scheduled airline flights, travelling with a larger group, or whose destination is nearer the airport’s western side. For either airport, compare the FBO or terminal, ground journey and onward itinerary.

Explore the United Arab Emirates ↗
RUNWAY & ARRIVAL

A dedicated facility for private flights

The airport operator describes Al Bateen as operating 24 hours a day and serving business aviation, official delegations and executive jet operators. Slot arrangements and handling conditions depend on flight purpose, schedule and current airport procedures; the public description of leadership-flight arrangements should not be read as a blanket slot exemption.

AZI

Executive and VVIP facilities

Abu Dhabi Airports lists a 2,200 m² VVIP facility, refurbished terminal and lounges, hangar and apron enhancements, and a dedicated fuel farm among its infrastructure developments. The airport operator or handling agent confirms which facility applies to a visiting flight.

Runway and aircraft planning

The published runway length is 3,202 m. Current declared distances, pavement restrictions, aircraft dimensions, parking position and fuel requirements should be confirmed through the UAE AIP, airport and handler. Wide-body or special-purpose movements require direct operational coordination.

Passenger arrival

Before travel, the operator can provide the exact terminal entrance, arrival time, border-control process and chauffeur meeting point. The business aviation terminal has a different passenger flow from Zayed International Airport.

Cars and ramp access

The airport is near central Abu Dhabi, but ramp access is controlled. Vehicle collection at the aircraft, if offered for the flight, must be arranged through the assigned handler.

BEYOND THE AIRPORT

Continue into Abu Dhabi or across the Emirates

Abu Dhabi waterfront and skylineDESTINATION GUIDEAbu DhabiExplore the city ↗

ADNEC and city centre

The airport operator estimates around five minutes by road to ADNEC; journeys to other districts vary with traffic, event schedules and the exact address.

Yas Island and Dubai

Abu Dhabi Airports estimates 15 minutes to Yas Island and about 50 minutes to Dubai. These are indicative road times and may change with traffic, roadworks and the final destination.

Explore the UAE ↗
BEFORE YOU FLY

Questions about Al Bateen Executive Airport

What are the airport codes? ⌄

IATA AZI and ICAO OMAD. Abu Dhabi’s main airline airport is Zayed International (AUH / OMAA).

Is Al Bateen a private jet airport? ⌄

Yes. Abu Dhabi Airports describes it as the capital’s dedicated business aviation airport.

How long is the runway? ⌄

The operator publishes a runway length of 3,202 m. Current declared distances and aircraft acceptance should be checked for the planned flight.

Is Al Bateen open 24 hours? ⌄

Abu Dhabi Airports states 24-hour operation. Slot and handling arrangements still depend on the movement and current procedures.

How far is Al Bateen from ADNEC? ⌄

The airport operator estimates five minutes by road, subject to traffic.

Should I choose Al Bateen or AUH? ⌄

Al Bateen is designed for business aviation within the capital. AUH may suit airline connections or other trip itineraries. Compare the overall journey and flight arrangements.

YOUR NEXT JOURNEY

Plan an executive flight to Abu Dhabi

Share the flight purpose, schedule, aircraft and destination address for a suitable airport and handling plan.

Request a quote ↗
Sources & map credits

Abu Dhabi Airports — Al Bateen Executive Airport; UAE AIP aerodrome chart; airport development information. Map data © OpenStreetMap contributors.

Necessary technologies are always active. Analytics is optional and starts only with your consent. You can change your choice here at any time.